Kenya House Construction
Cost Calculator
Accurate estimates based on current 2026 Kenyan market rates
Material Quantification
Module
Calculate individual building elements using standard Kenyan construction practices. Full formula display, editable assumptions, cost estimates and PDF report generation.
Blinding Concrete
Thin concrete layer beneath strip footings — Mix Ratio 1:3:6
Dry Volume = Wet Volume × 1.54 (voids factor)
Cement Bags = (Dry Vol × 1 / (1+3+6)) / 0.035 m³ per bag
Sand = (Dry Vol × 3 / 10) × 1.6 t/m³
Ballast = (Dry Vol × 6 / 10) × 1.65 t/m³
Strip Footing Concrete
Reinforced strip foundation — Mix Ratio 1:2:4
Dry Volume = Wet Volume × 1.54
Cement Bags = (Dry Vol / (1+2+4)) × 1 × (1000/50) × density
Sand = (Dry Vol × 2 / 7) × 1.6 t/m³
Ballast = (Dry Vol × 4 / 7) × 1.65 t/m³
Column Concrete
Rectangular reinforced concrete columns — enter one typical column size and quantity.
Dry Volume = Wet Volume × 1.54 (voids factor)
Cement Bags = (Dry Vol × cement ratio / total ratio ÷ 0.035 m³ per bag)
Sand = Dry Vol × sand ratio / total ratio × 1.60 t/m³
Ballast = Dry Vol × aggregate ratio / total ratio × 1.65 t/m³
Beam Concrete
Add Beam 1, Beam 2 and more beams. Each beam uses width, depth, length and concrete class.
Dry Volume = Wet Volume × 1.54
Total Materials = Sum of all beam volumes using selected concrete class
Column Base Concrete
Rectangular column bases/footing pads — length, width, depth, class and quantity.
Dry Volume = Wet Volume × 1.54
Cement / Sand / Ballast calculated from selected concrete class
Foundation Stones
9-inch rubble stone foundation — linear measurement and stone count
Linear Metres = Wall Area ÷ Stone Thickness (0.20 m)
Linear Feet = Linear Metres × 3.281
Stone Count = (Perimeter × Depth) ÷ (stone L × stone H × thickness) × 1000
Backfill Material
Fill volume and tonnage for floor build-up
Tonnes = Volume × Material Density (t/m³)
Murram ≈ 1.8 t/m³ · Hardcore ≈ 1.9 t/m³ · Gravel ≈ 1.65 t/m³ · Selected Fill ≈ 1.75 t/m³
Floor Slab Concrete
Ground bearing slab — Mix Ratio 1:2:4
Dry Volume = Wet Volume × 1.54
Cement Bags = (Dry Vol × 1 / 7) ÷ 0.035 m³/bag
Sand = (Dry Vol × 2 / 7) × 1.6 t/m³
Ballast = (Dry Vol × 4 / 7) × 1.65 t/m³
Machine Cut / Ndarugo Stones
Net wall area minus openings — 400 × 200 mm stones
Openings Area = Window Area + Door Area
Net Wall Area = Gross − Openings
Single Stone Area = 0.40 × 0.20 = 0.08 m²
Stone Count = Net Area ÷ 0.08 × (1 + wastage%)
Roofing Sheets Calculator
Pitched roof area, sheet count, ridge caps — multiple sheet types
Roof Area = Floor Area × Slope Factor × 1.1 (overhang)
Effective Cover Width = sheet width − overlap
Sheets (length) = Rafter Length ÷ Effective Sheet Length
Sheets (width) = Roof Width ÷ Effective Cover Width
Total Sheets = Sheets(L) × Sheets(W) × (1 + wastage%)
Tiles Calculator
Floor or wall tiling estimation with wastage calculation
Tile Coverage = Tile Length × Tile Width
Tiles Required = Area ÷ Tile Coverage × (1 + Wastage%)
Boxes Required = Tiles Required ÷ Tiles per Box
Paint Calculator
Wall painting estimation with coats and coverage rate
Or enter area directly = Total Wall Area (m²)
Total Area for Coats = Paintable Area × Number of Coats
Litres Required = Total Area ÷ Coverage Rate (L/m²)
Tins Required = Litres ÷ Tin Size